Construction Photos

The site as of 3/27/2011
The site before we started! Marked with All-Purpose Flour. August 2010
Leveling the hillside
Driveway



The foundation dug into the hillside as level as possible

Digging a 2ft deep by 2ft wide trench

Gravel on the driveway, parking area leveled