The site as of 3/27/2011 |
| The site before we started! Marked with All-Purpose Flour. August 2010 |
| Leveling the hillside |
| Driveway |
| The foundation dug into the hillside as level as possible |
| Digging a 2ft deep by 2ft wide trench |
| Gravel on the driveway, parking area leveled |
The site as of 3/27/2011