The site as of 3/27/2011 |
The site before we started! Marked with All-Purpose Flour. August 2010 |
Leveling the hillside |
Driveway |
The foundation dug into the hillside as level as possible |
Digging a 2ft deep by 2ft wide trench |
Gravel on the driveway, parking area leveled |